Our work
Real lifts, real jobs
Every photo here is from a REBLS job: finished lifts, install days, new cradles and bunks, rebuilds, and the worn parts we find along the way.
-
Wake boat on a 4-pole lift
-
Center console, lift serviced
-
Tri-toon on its lift
-
Deck boat, open water
-
End-of-pier lift
-
Small boat lift
-
Creek-side lift
-
Finished lift, winter river
-
Lifts on the river
-
New lift between pilings
-
Install day
-
Working from dock and boat
-
Pontoon lift install
-
Motor going on
-
Long-pier job
-
Guide poles set
-
Bunk lumber on site
-
New cradle, ready to go
-
Cradle assembly
-
Pontoon cradle & bunks
-
Pontoon cradle on the pier
-
Fresh carpeted bunks
-
Bunk carpet going on
-
Bunks from the water
-
New bunks set
-
On the cradle
-
Building bunks
-
Gearbox rebuild
-
Motor & gears opened up
-
Motor wiring
-
Control box
-
Found: frayed cable
-
Found: worn bearing
-
Found: rusted beam
-
Found: rotted piling top
-
Found: split bunk
-
Found: corroded cradle
-
Kayak lift conversion
-
Kayak boards on a PWC lift
-
Kayak launch build
-
Ramp to kayak launch
-
PWC lift
Calvert · St. Mary’s · Charles
Want your lift to look like this?
Call for a quote or a service call, or send a few details and photos. Emergency service is available when a lift fails with the boat on it.