Our work

Real lifts, real jobs

Every photo here is from a REBLS job: finished lifts, install days, new cradles and bunks, rebuilds, and the worn parts we find along the way.

Tri-toon pontoon boat raised on a lift at the end of a pier

  • Wake boat on a 4-pole lift

  • Center console, lift serviced

  • Tri-toon on its lift

  • Deck boat, open water

  • End-of-pier lift

  • Small boat lift

  • Creek-side lift

  • Finished lift, winter river

  • Lifts on the river

  • New lift between pilings

  • Install day

  • Working from dock and boat

  • Pontoon lift install

  • Motor going on

  • Long-pier job

  • Guide poles set

  • Bunk lumber on site

  • New cradle, ready to go

  • Cradle assembly

  • Pontoon cradle & bunks

  • Pontoon cradle on the pier

  • Fresh carpeted bunks

  • Bunk carpet going on

  • Bunks from the water

  • New bunks set

  • On the cradle

  • Building bunks

  • Gearbox rebuild

  • Motor & gears opened up

  • Motor wiring

  • Control box

  • Found: frayed cable

  • Found: worn bearing

  • Found: rusted beam

  • Found: rotted piling top

  • Found: split bunk

  • Found: corroded cradle

  • Kayak lift conversion

  • Kayak boards on a PWC lift

  • Kayak launch build

  • Ramp to kayak launch

  • PWC lift

Calvert · St. Mary’s · Charles

Want your lift to look like this?

Call for a quote or a service call, or send a few details and photos. Emergency service is available when a lift fails with the boat on it.

Call REBLS

301-997-4991

Office Mon–Fri, 8am–5pm. Emergency line: same number.

Call now Request service